Soil Stabilization, Chemical Shoring & Permeation Grouting

Boise Parks Bridge Abutment

Boise – Fair Grounds, Idaho Mar 12, 2026

Download project slides
bridge-abutment rebar and subgrade injection work (image 1)
The problem

What we found

After the bridge abutment excavation, compacted road mix dried out and developed cracks and fissures. The rebar structure had already been built on top of the fill before the fissures appeared. Leaving the soils in this condition risked future settlement and could have forced costly rework and schedule delays.

The solution

How we repaired it

We installed steel deep injection tubes on a tight spacing pattern to ensure full coverage, then injected structural foam at depth to improve soil integrity and load-bearing capacity throughout the support zone. This approach stabilized the subgrade without dismantling and rebuilding the rebar assembly.

Explore Soil Stabilization, Chemical Shoring & Permeation Grouting →
The result

What changed

The contractor avoided major rework and saved significant cost. The treated area achieved rapid strength gain, reaching most of its strength in minutes, so bridge construction could continue immediately.

Have a similar problem?

Let us test what is underneath.

We assess the site and test the soil before recommending a repair.

More project experience

Recent case studies

See all projects →
Installing helical tiebacks with a mini excavator
Foundation RepairBoise Foothills, Idaho

Complex Foundation Repairs

A newly developed neighborhood was built on 12 feet to 35 feet of fill material. Over the course of the first few years homeowners experienced differential foundation settlem…

Read the project