Soils sloughing during excavation
Loose soils slide or collapse into an excavation, compromising neighboring foundations, fence lines, or other improvements. Chemical shoring can bind soil particles to form a stabilized, excavatable soil mass.
Polyflow utilizes single-component polyurethane grouts for geotechnical soil improvement, including soil stabilization, chemical shoring, and permeation grouting. These systems improve the engineering properties of compromised soils by increasing bearing capacity, enhancing soil cohesion, and improving load-transfer characteristics. Polyurethane grouting can also be used beneath concrete slabs to mitigate frost-related heave associated with freeze-thaw cycles.
Chemical shoring involves the injection of polyurethane grout into loose, cohesionless soils, such as sands and silts, to bind soil particles and increase apparent cohesion, creating a stabilized, excavatable soil mass.

Loose soils slide or collapse into an excavation, compromising neighboring foundations, fence lines, or other improvements. Chemical shoring can bind soil particles to form a stabilized, excavatable soil mass.
Soil is disappearing around a downspout, a sump discharge, an irrigation line, or a concentrated runoff path beside the house.
Probing finds weak zones below the surface, or construction fill continues compressing under the weight of the structure above.
An existing garage slab may not have footings suitable for the planned living space. A structural engineer can specify permeation grouting to create a frost barrier and increase the soil's load-bearing capacity.
Call to schedule an uplifting inspection.
The inspection may include excavation, penetrometer testing, or review of an outside geotechnical engineer's report.
Polyflow prepares the estimate.
The client approves the estimate.
Polyflow selects the material for the site conditions. Options include single-component, low-viscosity hydrophobic polyurethane injection resin for soil permeation, void filling, and stopping active water intrusion. Polyflow may also use dual-component, high-density structural hydrophobic polyurethane foam for saturated soils and water-filled voids. Once installed, these materials do not leach chemicals into soil or groundwater. Most systems are available upon request as NSF-61 certified material.
5 year warranty. The installed materials are designed to last more than 900 years.


We don't believe getting warranty work taken care of should ever be a hassle.
If you have a concern with work we've completed, simply give us a call. We're always happy to come back out and take a look. Warranty calls are a priority for us, and we'll make every effort to get back to you as quickly as possible.
We take pride in standing behind our work. In fact, there have even been times when we've stepped in and covered warranty work for a competitor's customers. Either because they weren't sure who originally did the work or because the original contractor didn't honor their warranty.
That's the kind of company we want to be. We enjoy serving our customers, and we're always happy to return and make sure the job is taken care of right. You shouldn't have to worry about whether calling us back is going to be a hassle. If you need us, just give us a call. We'll be there.
5 year warranty
In Downtown Boise, loose soils were sloughing into a basement-addition excavation. Polyflow injected a single-component, low-viscosity polyurethane grout to bind the sandy soils into a stabilized, excavatable mass. After approximately 24 hours of curing, the contractor could continue work while protecting nearby structures.
Read the full case study →Polyflow work documented for soil stabilization, chemical shoring & permeation grouting.
During a renovation and addition project, excavation soils were not holding shape and were sloughing into the dig. Unstable excavation walls create serious safety risks for c…
Read the projectMany concrete leveling quotes are based on a quick visual inspection, a few measurements, and assumptions about the cause. In reality, settlement can be driven by deep soil i…
Read the projectThe pharmacy in Cascade caught fire and when the fire department came to put it out water ran from the pharmacy downhill under the library causing a void under the concrete s…
Read the projectA durable repair starts with the right diagnosis. Use these answers to understand the options, compare proposals, and know what a site-specific evaluation still needs to determine.
Visible settlement alone does not identify the cause. A useful investigation starts with the history of movement, drainage and leaks, then compares elevations, cracks, slab response and accessible soil conditions. Sounding, probing, test holes, ground-penetrating radar or geotechnical testing may be appropriate, depending on the structure and site. A void is an open space beneath or beside a structure; weak soil is material that exists but cannot provide adequate support. They require different injection strategies. For a Polyflow project, the proposed scope should state what was observed, what remains uncertain and why shallow void filling or deeper soil treatment is being considered. If movement may involve bearing soils, foundation design, slope stability or structural damage, a geotechnical or structural engineer should help diagnose the problem before repair decisions are made.
Injection may be worth evaluating when accessible slabs, foundations, canal edges, cisterns, retaining structures or other supported elements have documented voids or localized weak soil that can be reached from practical injection locations. Shallow injection is generally considered for filling spaces directly beneath or around a structure. Deeper injection may be considered when loose or weak zones extend below the immediate interface. Suitability depends on soil type, groundwater, utilities, structural condition, access and the source of soil loss. Polyflow-specific recommendations should follow site evaluation rather than assumptions based only on cracks or uneven surfaces. The best candidates also have a plan to control contributing water. Injection can restore contact or improve targeted soil zones when suitable, but it is not automatically the right response to every instance of settlement, leakage or erosion.
Injection may be a poor fit when the underlying cause is still active and uncontrolled, the structure is too damaged to respond safely, soils are unsuitable for predictable treatment, or movement involves a broad slope or deep geologic condition beyond the proposed treatment zone. It also does not replace failed waterproofing, broken piping, drainage correction, seawall or canal-wall reconstruction, foundation redesign, or structural repair. Around cisterns and water-related structures, material compatibility, containment, access and potential pathways into water must be evaluated carefully. A Polyflow proposal should identify exclusions and avoid presenting injection as a universal fix. When loads, stability, reinforcement, deep bearing conditions or public-water concerns are involved, the owner should expect input from the appropriate structural, geotechnical, plumbing, environmental or water-system professional before work proceeds.
Pre-work planning should establish the treatment objective: filling a known void, improving a weak zone, reducing pathways for erosion, supporting a slab, or some combination. The contractor should review available plans, utility markings, drainage patterns, leak history and prior repairs; document elevations and distress; and explain any recommended probing, scanning, borings or soil testing. General testing methods have limits, so results should be interpreted together rather than treated as certainty. For Polyflow work, ask for a written injection layout, anticipated depths, injection sequence, access points, monitoring method and stop criteria. Deep injection deserves particular care because subsurface conditions can vary between test locations. Where the treatment could affect a loaded foundation, retaining structure, canal edge or adjacent property, engineering review may be needed to define safe pressures and performance objectives.
The crew typically confirms utilities and work zones, records baseline conditions, drills or installs injection points, and introduces material in controlled stages. Shallow points target contact gaps or nearby voids; deeper points are arranged to reach selected soil zones. The exact material, spacing, pressure and volume should be chosen for the site rather than copied from another project. During injection, crews may watch elevations, cracks, gauges, material return, surface movement and pressure response. These observations help determine when to pause, relocate or stop. Polyflow-specific methods should be described in the contractor's scope, including whether lifting is intended or whether the goal is only stabilization or void fill. Injection is performed below the surface, so direct visual confirmation is limited; records and post-work monitoring are important parts of responsible execution.
The right comparison depends on the diagnosed cause. Alternatives may include drainage improvements, leak repair, excavation and recompaction, removal and replacement of a slab, conventional grouting, underpinning, piers, soil mixing, retaining-system repair, erosion-control work, or rebuilding a failed component. Some projects need a combination: for example, stopping a water source first and then filling the resulting void. Compare options by treatment depth, ability to verify the affected zone, structural implications, access, disruption, future inspectability and how each addresses ongoing water. Polyflow injection may offer a less invasive access approach when conditions are suitable, but that is a project-specific consideration, not proof that it is superior in every setting. Ask an independent engineer to compare concepts when foundation capacity, retaining stability, canal conditions or substantial structural movement is at issue.
Durability depends less on a single material description than on diagnosis, placement, soil conditions, loading and whether the cause of soil loss has been controlled. Properly placed material may remain in the treated zone, but untreated soil can still consolidate, wash out or move. Water can also find a new path. Injection cannot make variable ground uniform, repair structural members, or guarantee that cracks will close or never return. It may not reach every isolated pocket, and subsurface coverage cannot always be directly observed. For any Polyflow scope, ask what is expected to improve, what is specifically not promised, how completion will be documented and what conditions could require additional treatment. Long-term drainage maintenance and monitoring remain important even when the immediate treatment objective is achieved.
Injection usually uses localized access points, but the real disruption depends on access, drilling depth, equipment placement, noise, dust, landscaping, interior finishes and water-management needs. Furniture, vehicles, boats or stored items may need to move. Crews may need hoses across travel paths, temporary exclusion areas, or access through floors and hardscape. Work near canals, cisterns or active leaks can require additional containment and sequencing, while retaining structures may need movement limits or temporary precautions. Ask Polyflow for a site-specific access plan rather than assuming the work will be invisible. The plan should identify expected hole locations and patching, cleanup responsibilities, utility risks, areas that cannot be occupied, and whether water use or drainage must be modified before, during or after injection.
Major cost drivers include the size and depth of the treatment zone, whether the problem is an open void or weak soil, the number of injection points, material volume, drilling requirements and ease of equipment access. Testing, engineering, utility conflicts, groundwater, active erosion, containment near water, difficult surfaces and restoration can add scope. A deeper treatment is not priced simply by square footage because geology and response during injection influence effort and material use. Compare Polyflow proposals by assumptions and included tasks, not only by the total. Ask whether investigation, mobilization, permits if applicable, monitoring, patching, drainage work, engineering, additional material and return visits are included or separate. Unusually precise pricing before diagnosis may hide exclusions or rely on assumptions that should be stated in writing.
Before hiring, ask who diagnoses the cause, who selects depths and pressures, what experience the crew has with your type of structure, and when an engineer is involved. Request the proposed material, injection map, baseline elevation records, stop criteria, exclusions, change-order process and documentation you will receive. Also ask how unexpected material migration, uplift, utility damage or water pathways would be handled. After Polyflow work, follow written restrictions for the treated area and inspect patches, drainage, plumbing and nearby surfaces. Keep dated photographs and reassess elevations or crack widths at agreed intervals. Report sudden movement, new leakage or rapidly changing cracks promptly. Monitoring does not mean the repair failed; it recognizes that soil and water conditions evolve. Clarify any written workmanship or material terms, their exclusions, and who evaluates future movement before signing.
Estimates are free and done on site. We test the soil before we quote, so the price reflects the actual problem.