The problem

What we found

During a renovation and addition project, excavation soils were not holding shape and were sloughing into the dig. Unstable excavation walls create serious safety risks for crews and can jeopardize nearby structures. In dense urban settings, loss of soil support can compromise existing footings and adjacent improvements.

The solution

How we repaired it

We performed chemical shoring using a single-component polyurethane soil binding system. Steel injection tubes were driven to the required depth and a low-viscosity polyurethane was injected to bind sandy soils and fill voids. In the presence of soil moisture, the product reacts and expands modestly, then cures over approximately 24 hours into a solid, excavatable mass, allowing excavation to proceed safely.

Explore Soil Stabilization, Chemical Shoring & Permeation Grouting →
The result

What changed

The excavation was stabilized quickly and reliably, improving jobsite safety and protecting surrounding structures. The contractor was able to continue work with confidence once curing was complete.

Have a similar problem?

Let us test what is underneath.

We assess the site and test the soil before recommending a repair.

More project experience

Recent case studies

See all projects →
Installing helical tiebacks with a mini excavator
Foundation RepairBoise Foothills, Idaho

Complex Foundation Repairs

A newly developed neighborhood was built on 12 feet to 35 feet of fill material. Over the course of the first few years homeowners experienced differential foundation settlem…

Read the project