What we found
This project involved a three-story apartment complex. During the initial excavation phase of the construction process the compaction inspection was overlooked. The construction of the structure was completed; one year after the certificate of occupancy was given, the city noticed the missing compaction test. A geotechnical engineer was employed to test the load bearing capacity of the soil and found that it was rated at 1500 psf. The structural engineer specified 3000 psf for this specific project. The foundation soil needed to be brought up to the specification to insure the long-term structural integrity of the building.
