What we found
There were a few small surface holes in the asphalt in a parking lot. Upon further inspection we found that some of the holes were up to 21 feet deep. The area was closed off to prevent vehicles from entering the area of concern.
Caldwell, Idaho Sep 25, 2026
Download project slidesThere were a few small surface holes in the asphalt in a parking lot. Upon further inspection we found that some of the holes were up to 21 feet deep. The area was closed off to prevent vehicles from entering the area of concern.
There was power, communication and sewer in the area so we had location services come and mark all of the utilities. We placed our injection tubes up to 20 feet deep with our proprietary deep injection system. The first visit we had a total of 8 injections and we installed a large amount of material to fill and stabilize the void. After this initial visit we got another call from the property owner with a new area and a new hole for us to come and to remediate.
Explore Soil Stabilization, Chemical Shoring & Permeation Grouting →After two visits the area is now stable and the parking lot has been restored to normal use.
We assess the site and test the soil before recommending a repair.
A newly developed neighborhood was built on 12 feet to 35 feet of fill material. Over the course of the first few years homeowners experienced differential foundation settlem…
Read the projectMany concrete leveling quotes are based on a quick visual inspection, a few measurements, and assumptions about the cause. In reality, settlement can be driven by deep soil i…