The problem

What we found

Both the garage floor as well as the driveway settled more than 6 inches causing an extreme trip hazard and a major inconvenience for access into the garage. Not only did the garage floor settle but there was a large void under it that needed to be filled as well.

The solution

How we repaired it

The first part of the process was to fill the void under the garage floor and then to begin lifting the garage floor back to its original height. This large void under the garage floor took a lot of material to fill. Any voided area under a concrete slab can cause damage or settling in the future. Once the garage floor was lifted into place, we could then slowly and systematically lift the driveway. Inexperienced concrete lifters can lift too much or to fast in one injection site causing undo stress on the concrete which may lead to stress cracking. This slow lift process is a critical part of our lifting system. There is always a chance that concrete can crack but we have proven systems for preventing cracking as much as possible. The garage floor and driveway is back to its original grade and height.

Explore Concrete Lifting →
The result

What changed

This project went as smoothly as it could have gone, in fact, we had an audience from the neighbors during the whole visit. When we were finished one of the neighbors had us come to his house immediately afterwards to do the same thing to his garage floor and driveway. We love to be able to serve neighbors on the same day while we are there.

Have a similar problem?

Let us test what is underneath.

We assess the site and test the soil before recommending a repair.

More project experience

Recent case studies

See all projects →
Installing helical tiebacks with a mini excavator
Foundation RepairBoise Foothills, Idaho

Complex Foundation Repairs

A newly developed neighborhood was built on 12 feet to 35 feet of fill material. Over the course of the first few years homeowners experienced differential foundation settlem…

Read the project